When your plant runs at over 90% capacity, there’s no room for error. But if half of your operators are new and most of your senior staff are retiring, you need a solution to train new personnel quickly, test safely, and maintain performance. That’s why Rawhide Energy Station partnered with Emerson.
This case study demonstrates how Rawhide Energy Station used Emerson’s Ovation digital twin simulator to transform training, improve control logic testing, and reduce simulated startup and shutdown time by 44%.
With this solution, they achieved:
- Over 400 man-hours of simulator training in just four months.
- A 44% reduction in simulated startup and shutdown time.
- Safer, faster control logic testing without risking live operations.
- A scalable platform for continuous improvement and patch verification.
Download the case study and see how digital simulation drives performance in the real world.
Want to see more solutions?
Fuel Waste and Startup Delays Are Holding Plants Back — Here’s How One Utility Solved It
Discover how a large power-generating unit cut fuel use by 67% and improved startup performance with Emerson’s combined cycle optimization strategy.
Frequent Shutdowns and Inefficient Steam Control? This Plant Found a Smarter Way
Discover how a Taiwan-based power plant improved thermal control and saved $105K annually with a modular desuperheater upgrade.
Modernizing Black Start Units for Faster, Smarter Grid Recovery