Unplanned downtime, frequent valve replacements, and rising maintenance costs are more than operational headaches. They are profit killers.
One combined cycle power plant in Poland faced this exact challenge. Their non-Emerson condensate control valve failed every two to three years due to flashing damage, costing thousands in parts and labor.
In this case study, you’ll learn how Emerson helped them:
- Extend valve life beyond two years with zero wear.
- Reduce maintenance and replacement costs.
- Improve control performance in a severe service application.
- Save over 20,000 US dollars with a durable, automation-ready solution.
Do not wait for the next failure to hit your bottom line.
Download the case study to avoid these pitfalls and discover a solution that enhances power generation reliability.
Want to see more solutions?
Cut $17,000 in Annual Losses with Smarter Valve Control
A Thailand power plant saved $17,000 per unit every year by fixing controllability and noise issues. You can too.
Avoiding the Wrong Fix Saved This Plant $1 Million
Discover how Emerson’s advanced diagnostic services identified the true cause of turbine trips, saving over $1 million in penalties, repairs, and downtime.
How One Power Plant Saved $120,000 by Upgrading Cooling Water Flow Control