When reliability matters most, modernization delivers results. This case study highlights how a utility upgraded its dual-fuel black start units with Emerson’s Ovation gas turbine control system to support faster, more confident grid restoration.
Discover how the project delivered:
- An 80% faster startup time.
- Real-time condition monitoring and remote access.
- Doubled the compressed air capacity for more frequent starts.
- Over $110,000 in annual savings from improved efficiency and reduced maintenance.
- Greater operational visibility and control across the fleet.
Download now to see how integrated automation can transform emergency preparedness into a strategic advantage.
Want to see more solutions?
Fuel Waste and Startup Delays Are Holding Plants Back — Here’s How One Utility Solved It
Discover how a large power-generating unit cut fuel use by 67% and improved startup performance with Emerson’s combined cycle optimization strategy.
Untrained Operators. Risky Startups. Costly Delays. This Plant Fixed It.
See how Rawhide Energy Station used Ovation digital twin simulation to boost operator readiness and reduced risk.
Frequent Shutdowns and Inefficient Steam Control? This Plant Found a Smarter Way
