Frequent cycling, inefficient startups, and rising fuel costs are becoming the new normal for combined cycle plants. Without a strategy to optimize the full operational cycle, plants risk higher emissions, longer startup times, and unnecessary fuel burn.
In this case study, see how one U.S. utility partnered with Emerson to:
- Reduce average hot start fuel usage by 67%.
- Cut transition fuel usage by 31%.
- Enable faster, more consistent startups across 50 hot starts and 300 transitions per year.
- Improve emissions and operational efficiency.
- Lay the foundation for repeatable performance across multiple units.
If your plant is cycling more often, now is the time to rethink your startup strategy. Download the case study to get more insights.
Want to see more solutions?
Untrained Operators. Risky Startups. Costly Delays. This Plant Fixed It.
See how Rawhide Energy Station used Ovation digital twin simulation to boost operator readiness and reduced risk.
Modernizing Black Start Units for Faster, Smarter Grid Recovery
Explore how a U.S. utility improved startup reliability and saved over $110K annually with Emerson’s Ovation control system.
Frequent Shutdowns and Inefficient Steam Control? This Plant Found a Smarter Way
